HOME // CASE STUDIES // Oxford Street, Fitzrovia
CASE STUDY.
THE BRIEF.
Enabling and temporary works to support neighbouring buildings and the road during the demolition of a 6 storey building.
THE SOLUTION.
Design and install temporary shoring on a floor by floor sequence from top down, underpin party walls and cast 750mm deep raft slab.
PROJECT DETAILS
Client: Emperor Group
Principle Contractor: Patterson Construction
Structural Engineer: Michael Barclay
Architect: ESA Architects
Location: Fitzrovia, London