Groom Place, Belgravia

HOME  //  CASE STUDIES  //  Groom Place, Belgravia

CASE STUDY.
THE BRIEF.

Form new double basement, swimming pool, Mansard roof extension and structural alterations

THE SOLUTION.

Part demolish existing structure, install single pile to support existing mews façade. Reinforced underpins in two stages, dewatering, excavate and form basement slab walls and suspended ground floor slab including structural steels.

PROJECT DETAILS

Client: Private
Principle Contractor: Patterson Construction
Structural Engineer: Private
Architect: Private
Location: Belgravia, London

pattersonconstruction-structrualalterations

PROJECT IMAGES

A company you can trust

We would like to thank Patterson Construction Limited for the smooth, efficient and speedily carried out façade retention, demolition, underpinning and raft slab to our Oxford Street project. We look forward to working with their team again in the future.
Emperor Group

We have worked with Patterson Construction for a number of years on varied contracts and have found them to be very professional and thorough in all aspects of the work involved. We have learned a lot from their problem solving initiatives on difficult contracts through to their steadfastness in ensuring contracts completed on time.
JF CONSTRUCTION

We worked with Patterson Construction Limited on a very complex basement in Shoreditch. PCL went down 2 levels in concrete and waterproofing and up 4 levels in steel. There were numerous problems on the project and they overcame each and every one. We now have a very successful hotel and restaurant and I would recommend these guys to any main contractor.
Neil Crow, Soho House

Having worked with Patterson Construction on several contracts over a number of years, they have always maintained a professional and efficient working relationship with our company.
Eamonn Malone, Thames Materials

Scroll to Top